New: the four-minute film. Follow one order from the first hello to the final payment. Watch now
CIM WorkspaceCustomer Intelligence ManagementMake your Business Agentic
RunOptional module

From batch record to margin, in one place.

The Production module in CIM Workspace is a separate workspace for the plant. The production team maintains batch records; the director sees raw materials with their rate history, campaign costing, products with their bills of materials, and analysis of yield, cost and margin.

Campaign costing · sodium benzoateBatch of 1,000 kg theoretical
Raw materialQty (kg)Rate (₹/kg)Amount (₹)
Benzoic acid847165.001,39,755
Caustic soda27848.0013,344
Process water4000.50200
Raw material cost1,53,299
96.4% yield₹159.0 per kg raw material₹177.0 ex-works13.7% margin
Illustration with example figures.
What it does

Production costing, at a glance.

Batch log

Automatically numbered batches with quantities, approval and quality results, for the production team.

Raw materials

Every raw material with its rate history.

Campaign costing

The cost of a production campaign from its bill of materials and current rates, through to ex-works price and margin.

Products and BOMs

Bills of materials, with theoretical output calculated from molecular weights.

Analysis

Yield over time and the trend of cost and margin per product.

How it works

Step by step.

  1. Add raw materials and their rates.
  2. Set up products and their bills of materials.
  3. The production team logs batches; the director reviews costing and margins.
Who uses it

Built for the people who do the work.

  • ProductionThe batch log only, with no cost data.
  • DirectorFull access.
Key facts

The rules, exactly.

  • Enabled per company.
  • The production role never sees cost data.
  • All quantities and rates must be zero or more.
Questions

Asked about production costing.

Is production part of the CRM?

It is a separate workspace on the same sign-in, enabled per company.

All questions

So the next time a buyer requests a price, you respond first.

A 30-minute call: we run one of your real orders through CIM Workspace, from enquiry to payment.